Top Drive Cementing Head

Contact Us

Wellcare Oil Tools Private Limited

F-209/210, IId, Riico Industrial Area, Khushkhera, Bhiwadi, Rajasthan - 301707, India

Mobile : +91-8696934507

Phone : +91-1493-250357

Fax : +91-1493-250157

Call Us : 08045135473


Top Drive Cementing Head


Top Drive Cementing Head having 4-1/2” I.F. Box up and Pin down connections for 15,000 PSI Cementing Line and Tensile Strength of 400 Ton. The integral body of Cementing Head removed all internal connection and easy to use. Top Drive Cementing Head comprises with Flag sub and Ball dropping sub. The Positive Ball Dropping Sub is used to release varied sizes of setting balls to a ball seat down hole. This can be accomplished without breaking a drill pipe connection at the surface or by removing a hammer union cap. The ball is enclosed in a recess unaffected by the flow of fluids and is released with a simple turn of the handle. The handle is locked during the circulation period thus preventing possible premature release of setting ball. The sub is designed to drop varied sizes of ball, ranging from 1.25” to 2.25“diameter.

  • Provides “positive” means to release a setting ball down.
  • Ball is protected from fluids while conditioning the liner.
  • Simple operation.
  • Drops various sizes of balls.
  • Flag sub is placed immediately below the plug dropping head and swivel.
  • The position of the Flag indicates that the pump down plug has been released from the head and has moved down the drill pipe.
  • Positive indication that plug has left the cementing head.
  • High tensile strength.
  • Drill pipe connection standard.
  • The integral Body Cementing Manifold suspends drill pipe weight from the rig elevators while retaining the plug so that it can be released after cementing has been completed. The IBCM also connects the cementing lines to the running string during liner operations, and includes a heavyduty swivel for easy string manipulation with the cementing lines in place.
  • This swivel mechanism and drill pipe plug retainer are built in below the elevators for unobstructed operation. A ball drop assembly is integral with the plug dropping manifold for use with hydraulic-set liner systems.


Features and Benefits :

  • Maximum strength and toughness from quenched and tempered alloysteel construction.
  • Displacement fluid and cement are diverted below or above the plug through an external manifold.
  • Manifold rated to 15,000 PSI working Pressure.
  • Cementing flag sub for visual indication of drill pipe wiper plug release is integral with the Plug Dropping Manifold.
  • Heavy duty swivel permits easy manipulation of the string without having to break down the cementing lines.

Specifications

Model Wc-tdch
Product No. Wc-11702
Material Metal
Condition New
Warranty 1 Year
Usage Industrial



Looking for Product Name ?